Form 677 (05.13) ©SOR Inc. 1/36The Multipoint Electronic Level Switch is a level sensing device which reads process level by capacitance measurement.C
10/36Form 677 (05.13) ©SOR Inc. Set Threshold for Level AWatch the probe loading LED:LED is on — close DIP switch 1 and go to step 2. LED is off —
Form 677 (05.13) ©SOR Inc. 11/36All ModelsThe capacitor substitution box will inject capacitance, emulating the probe.Using the thumbwheels on the cap
12/36Form 677 (05.13) ©SOR Inc. Calculated Probe Set upInject the picofarad equivalent of maximum level from line 11 of the worksheet. Watch the probe
Form 677 (05.13) ©SOR Inc. 13/36Calculated Set up Vessel Level A Vessel Level B Line
14/36Form 677 (05.13) ©SOR Inc. Calculated set point set up Continued from page 9.The pf value from worksheet line 11 should still be injected. Turn s
Form 677 (05.13) ©SOR Inc. 15/36Time Delay AdjustmentsSet point 1 may be equipped with time delay adjustments. Both on delay and off delay are one tur
16/36Form 677 (05.13) ©SOR Inc. Model 662 Set Point Set up and Output WiringActual Level set point set up Continued from page 8.Process level must be
Form 677 (05.13) ©SOR Inc. 17/36Output Relay WiringBefore connecting output relays to external devices, determine which failsafe mode is best suited f
18/36Form 677 (05.13) ©SOR Inc. Model 663 Set Point Set up and Output WiringSet Point 1Set Point 2Set Point 3AdjustPresence LED*On Delay*Off Delay*Rel
Form 677 (05.13) ©SOR Inc. 19/36Output Relay WiringBefore connecting output relays to external devices, determine which failsafe mode is best suited f
2/36Form 677 (05.13) ©SOR Inc. Adjustable Differential Set PointsModels 665 through 668 include an adjustable differential set point. For the adjustab
20/36Form 677 (05.13) ©SOR Inc. Model 664 Set Point Set up and Output WiringActual Level set point set up Continued from page 8.Process level must be
Form 677 (05.13) ©SOR Inc. 21/36Output Relay WiringBefore connecting output relays to external devices, determine which failsafe mode is best suited f
22/36Form 677 (05.13) ©SOR Inc. Model 665 Set Point Set up and Output WiringUPPER LIMITLOWER LIMITRANGESPANUpper Limit AdjustPresence LED for Upper Re
Form 677 (05.13) ©SOR Inc. 23/36Output Relay WiringBefore connecting the output relay to external devices, determine which failsafe mode is best suite
24/36Form 677 (05.13) ©SOR Inc. Model 666 Set Point Set up and Output WiringSet Point 1Upper Limit Adjust*Presence LED *On Delay*Off DelayRelay On LED
Form 677 (05.13) ©SOR Inc. 25/36Time Delay AdjustmentsSet point 1 may be equipped with time delay adjustments.Both on delay and off delay are one turn
26/36Form 677 (05.13) ©SOR Inc. Model 667 Set Point Set up and Output WiringActual Level set point set up Continued from page 8. Process level must be
Form 677 (05.13) ©SOR Inc. 27/36For set point 4:LO mode: When the set point is satisfied, the relay turns on. When process level falls below the set p
28/36Form 677 (05.13) ©SOR Inc. AdjDiffSet Point 4TerminalsSet Point 1TerminalsUPPER LIMITRELAYFAIL SAFELOWER LIMITSPANRANGERELAY FAIL SAFETIME DELAYO
Form 677 (05.13) ©SOR Inc. 29/36Output Relay WiringBefore connecting output relays to external devices, determine which failsafe mode is best suited f
Form 677 (05.13) ©SOR Inc. 3/36Set upReview Probe set up overview and considerations on page 6 to determine the best ap-proach to set up. Two set up m
30/36Form 677 (05.13) ©SOR Inc. Power SupplyLineNeutralGroundIMPORTANT! Do not provide separate earth grounding for the process connection. This can
Form 677 (05.13) ©SOR Inc. 31/36Control Drawing
32/36Form 677 (05.13) ©SOR Inc. Control Drawing
Form 677 (05.13) ©SOR Inc. 33/36Dimensions - W Housing Con gurationLinear = mm/inchesDrawing 0390655Dimensions are for reference only.Contact the fac
34/36Form 677 (05.13) ©SOR Inc. 101.64.00BCINACTIVE SHEATH LENGTH(PER MODEL NUMBER)19.10.75(INACTIVE SHEATH ONLY)A LENGTH(PER MODEL NUMBER)D180.97.12E
Form 677 (05.13) ©SOR Inc. 35/36Dimensions - R Housing Con rmation (Explosion-Proof Remote)3/4 NPTFELECTRICAL CONNECTION1 NPTF STANDARD3/4 NPTF OPTIO
36/36Form 677 (05.13) ©SOR Inc. 50.82.0031.81.2528.41.1231.81.2554.02.1327.01.06SEE DETAIL ADUAL CABLE PROBE DETAIL3/4-16 UNF-2BDUAL RIGID PROBE DETA
4/36Form 677 (05.13) ©SOR Inc. Electrical Supply / Control Cable ConnectionConnect the shield to GND on the set point adjustment board and on the prob
Form 677 (05.13) ©SOR Inc. 5/36This product must be installed with an explosion proof breather vent per Agency requirements and the national Electric
6/36Form 677 (05.13) ©SOR Inc. Probe Set up Overview and ConsiderationsIf the process can easily be raised and lowered during set up, use the Actual L
Form 677 (05.13) ©SOR Inc. 7/36Probe Tip Termination NotesFor sheath probes, the last inch of the rigid probe is inactive.The flexible probes terminat
8/36Form 677 (05.13) ©SOR Inc. For Actual Level Set up, the process must be positioned to maximum level to set the probe span. The process is then low
Form 677 (05.13) ©SOR Inc. 9/36Calculated Set upOff (open) positionGND wire (shield drain)Probe span potProbe loading LEDProbe leadRange selection DIP
Kommentare zu diesen Handbüchern